Kredi Kayıt Bürosu – Anadolu Data Center (Malıkoöy, Ankara Turkey) -2st Phase
 

White Space 3 and White 4 cooling systems engineering, supply, installation and commissioning of 20 x 150 kWc Flaktgroup Air to Air cooling systems

Mechanical Works

Electrical Works

Heat Load Testing
 

Hayat Kimya Pakistan Hygiene Plant Fire Suppression and Prevention Systems

Water, Foam and Gas Based Fire Prevention system design, supply, installation and commissioning (according to NFPA) of Hayat Pakistan’s Faysalabad Hygiene Plant

10 zones of water based sprinkler systems

Electrical and Diesel fire pump systems

Undergorund hydran systems

Fire Hose Reel Systems

Foam Based suppression systems for fuel tanks and diesel generators

CO2 based suppression systems (local application)

FM-200 based suppression systems
 

2016
 

Kredi Kayıt Bürosu – Anadolu Data Center (Malıkoöy, Ankara Turkey) -1st Phase

Uptime Institute Tier-IV Certification

44.000 m2 landplot (reserved of 3 Phase),

21.000 m2 Closed Space (phase-I)

Total White Space 4 x 650 m2

8x2 MW Power (total for 3 phases 3 x 8 x 2 MW = 48 MW)

Dynamic UPS Systems

Air to Air Preccission Cooling Systems

Construction, Civil & Architectural Works

Power / Energy / Electrical / Mechanical Works

Data Cabling / Commissioning

Network Monitoring Systems (SCADA, BMS, DCS Systems, DCIM Systems)

Data Center Commissioning / System Transfer
 

Istanbul Metropolitan Municipality Başakşehir Tier III Data Center

Engineering Design for Uptime Institute Tier III certification

Uptime TCDD (Tier certified Design Documents)

3400 m² Project Space

2 x 500 m² White Space & Service Hall

750 m² Technical Space

1750 m² Data Center Management Space

2x1,6 MW Power

Civil Works

Refurbishment Works

Strengthening Works

Architectural Works

Power / Energy / Electrical / Mechanical Works

Data Cabling / Commissioning

Network Monitoring Systems, BMS, PMS, DCIM and SCADA systems

Data Center Commissioning / System transfer
 

2015
 

Vakıfbank Umraniye VIVEM Data Center, Ümraniye İstanbul

900 m2 Project Space

400 m² White Space

500 m² Technical Space

Uptime Institute Tier-III Certification design and engineering documents

Construction - Civil & Architectural Works

Power / Energy / Electrical / Mechanical Works

Data Cabling (Intelligent Patching) / Commissioning

Network Monitoring Systems (SCADA, BMS, DCS Systems)

Data Center Commissioning / System transfer
 

Hayat Kimya - Nigeria Factory

Hayat Kimya – Egypt Factory

Hayat Kimya – Mersin Factory

Hayat Kimya – Golcuk Factory
 

2014

DELTA Combined Cycle Power Plant – 2nd Phase extension to 180 MW (120 million USD investment value)

ERIC 285mW Hydroelectrical Power Plant (550 million USD investment value)

PALGAZ - PALEN Natural Gas Distributing Networks Investments

Turkcell Baskent OMC Building Tier – III Data Center

Zorlu Holding – Luleburgaz Textile Factory System Room
 

2013

ALES Combined Cycle Power Plant – 62mW (60 million USD investment value)

FIAT Automotive Factory –Mechanical Building (8) Fire suppression systems

Hayat Kimya – Middle East Hygiene Factory & Cellulose Warehouse

Turk Telekom IPTV System Room Close Control Air Conditioning Systems
 

2012

PALGAZ - PALEN Natural Gas Distributing Networks (40 million USD investment value)

Volkswagen Dogus Financial VDF System Room

TURKSAT – Ankara Data Center (Phase II)

Hayat Kimya–Middle Eastern Factory,

Hayat Kimya–North Africa Factory,

Kcel –Cyprus,

Turkcell Ankara 400m2 Datacenter,

Hayat Kimya–1500m2 Electrical Rooms,

Hayat Kimya –MCC,

Tofaş ASRS Building,

Altes,

Koc System,

Turk Telecom System Rooms Close Control Air Conditioning Systems

NETAS, Bakuport, Yapikredi Bank, Kcel –Cyprus, Astana Media Center, Digiturk, Turknet System Room,
 

2011

System Control Rooms

Turksat, Denizbank, Koc System, Movenpick Building, Sivas-CEDAS, Burs –Uludag Electric, Digiturk Infrastructure Works

Yapı Kredi 2500m2 Data Center

Tofaş, Renault, Turk Telecom Mobile-TV, Koc System, Superonline Close Control Air Conditioning Systems

Turk Telekom, Astana Medya Center, Grid Telecom, Alarko - Borsypil Airport, Presidency of the Republic, Erciyes Univercity, SGK Head Office, KCell Server Room, Digiturk, Tubitak Close Control Air Conditioning Systems
 

2010

Global Telecommunication Dudullu Data Center

TRT Head Office Data Center

Albaraka Turk Bank Data Center

ING Bank Data Processing Center Construction and Infrastructure Works

Vodafone Tuzla MTX Building Data Center
 

2009

DELTA Combined Cycle Power Plant – 1st Phase – 60 MW (60 million investment value)

Oyak Renault Otomobile Factory – New Head Office

Turksat

Erikli Waters & Nestle Waters Bursa Datacenters

Yapi Kredi Bank, ING Bank, Zirve University, General Directorate of Forestry

Istanbul – Basaksehir Main Pop Point(Tellcom), İzmir–Cankaya Main Pop Point(Tellcom)
 

2008

Kalkinma Bank, Antalya - 112 Emergency, METU, POLNET

Turksat, Sabiha Gokcen Airport Hangar Constructing, Bahcesehir Tellcom, Deniz Bank

Turkcell Mersin GSM Santral, Ankara Metropolitan Municipality
 

2007

Palgaz and Palen Awarded Palmet 87 Gas Pressure Reducing Stations and Metering Systems for their Gebze and Erzurum Gas Networks.

Lootah BC Gas Awarded Palmet 18 Metering Stations for Dubai’s Palm Island Development.

Lootah BC Gas Awarded Palmet a City Gate ‘A’ Type RSM Gas Pressure Reducing and Metering Station for Tanzania.

Temsa awarded Palmet a huge Fire Protection Project for its New Plant including Water-Based and Foam Extinguishing Systems.

Eczacibaşi – Kanyon Building RF works

GEA Klima San. Ve Tic. A.Ş. – Factory Turnkey EPC project (10.000 m2)
 

2006

Palmet is awarded 10.000 m2 of Raised Floor Systems in this prestigious new development.

Palmet wins further Protection System Contracts for the new wing of Renault Bursa Factory, encompassing Reliable Sprinklers and Valves. Renault is Palmet’s oldest customer with contracts stretching back to 1984.

Palmet was awarded the Facility Management Contract for over 1000 BTS Telecom Sites in the Marmara Region of Turkey from Turkcell

Palmet receives a Design Build Contract Award from Bloomberg’s to build its Data Centre in the Istanbul Kanyon Building, encompassing Denco Air Conditioners, Flopal Raised Floors, Hygood FM200, Tracetek Water Detection Systems, VESDA Early Warning Alarm Systems, GEA Perimeter Heaters and Fan Coils.

Palmet is awarded the Fire Protection Contract for the Bolu Tunnel Projects and installs a Ductile Hydrant Line, Pump Sets and Hose Reel Extinguishing Systems.

Palmet continues its long-term relationship with Turkcell and is re-awarded a planned Maintenance and Service Contract to look after the Denco Ai Conditioning and FM200 Fire Systems in all of their regional Switch Rooms (MSC’s).
 

2004 – 2005 Pakistan Paktel

As a result of Palmet’s considerable success in Pakistan, Paktel, a Millicom company and one of the oldest GSM Operators in Pakistan, concluded a contract with Palmet to expand their existing Network by providing Site Acquisition, Technical Site Surveys, Tower and Shelter Supplies, Construction and Implementation of over 200 ZTE supplied BTS Stations in the Central and Northern Regions of Pakistan. This project was signed in January 2005 and was concluded early in 2006.
 

2005

Palmet wins its largest ever contract award from Türk Telekom to supply over 600 Denco Close Control Air Conditioning Systems to be installed throughout Turkey.

Palmet was awarded a major Data Centre Infrastructure Package for Havelsan Ankara Centre encompassing HVAC, Power and Architectural Systems.
 

2002 Tubitak-Ume

Palmet successfully concluded an order for the Design, Installation and Commissioning of 98 sets of highly specialized Close Control Air Conditioning Systems for Tubitak’s brand new Testing Laboratories. It total, there were 72 Rooms, including EMC Rooms, Standards Centre, Anechoic Chambers, Electronic Test Beds, Seismic Test Facilities and numerous Clean Rooms.

Paktel – Pakistan , Signed Phase II Order with Palmet for a further 220 BTS Stations.
 

2002 Palmet/Nortel Networks Joint Venture

Largest single contract awarded to date for 2000+ BTS Stations, Palmet took responsibility for Site Acquisition, Engineering, Logistics, LOS, Supply of Towers, Shelters and all Accessories, Implementation, Integration and First Line Maintenance.

Palmet was re-awarded its Long-Standing Service and Maintenance Agreement for Oytek’s Istanbul Head Office.
 

2004 Citibank

Management Building (Refurbishment Work): Conceptual Design; Interior Decoration, Building Modifications, Suspended Ceilings, Raised Flooring, Partitioning, Furniture, Carpets etc., Electrical Works: Lighting, Low, Medium and High Voltage Networks, UPS, Building Transformers, Generators, Building Automation, Mechanical Works: FM200, Close Control A/C Units, HVAC etc.

Palmet is awarded a large ‘POP’ Centre ‘IT’ Room Infrastructure Package.
 

2004 SSK Project

Management Building (Refurbishment Work): Conceptual Design; Interior Decoration, Building Modifications, Suspended Ceilings, Raised Flooring, Partitioning, Furniture, Carpets etc., Electrical Works: Lighting, Low, Medium and High Voltage Networks, UPS, Building Transformers, Generators, Building Automation, Mechanical Works: FM200, Close Control A/C Units, HVAC etc.
 

1987 – 2005 Oyak – Renault

Mechanical Works (Fire Detection and Extinguishing Systems, Electro-Mechanical Works)
 

1995 – 2005 Turkcell –Ericsson

Main Switch Centers and Electronic Offices; Construction Works; Suspended Ceilings, Raised Flooring, Partitioning, etc., Electrical Works: Medium and Low voltage, UPS, Transformers, Generators, Building Automation, Mechanical Works: FM200, Close Control A/C Units, HVAC etc.
 

1996 – 2005 KOÇ Group (Kocbank/Kocsystem/Kocfinans/Kocalianz/Koc Bryce/Arcelik)

Data Centers and System Rooms (Construction Works: Greenfield Sites, Design and Construction, Foundations, Seismic Works, Suspended Ceilings, Raised Flooring, Partitioning etc., Electrical Works: Lighting, Medium and Low Voltage Systems, UPS, Building Transformers, Generators, Building Automation, Mechanical Works: FM200, Close Control A/C Units, HVAC etc.)
 

1999 – 2004 Avea (Aycell + Aria)

Main Switching Centers (MSC’s); Construction Works; Suspended Ceilings, Raised Flooring, Partitioning, Security Access etc., Electrical Works: Lighting, Medium and Low Voltage Network, UPS, Building Transformers, Automation, CCTV, Fire Detection, Mechanical Works: FM200, Close Control A/C Units, HVAC, etc.
 

1991 – 2004 T.C. Ziraat Bank

Data Processing Centres and Electronic Offices; Construction Works; Suspended Ceilings, Raised Flooring, Partitioning etc., Electrical Works: Lighting, Medium and Low Voltage Power Networks, UPS, Transformer Stations, Generators, Building Automation, Mechanical Works: FM200, Close Control A/C Units, HVAC etc.
 

1999 – 2004 Zorlu Energy (Bursa, Ankara, Gaziantep Power Plants)

Full Fire Scope; Design Services to NFPA Standards, Fire Pumps, Wet & Dry Sprinkler Systems, Hydrant Lines, Foam Systems, CO2, FM200 and Fire Detection.
 

2002 Oytek Building

Palmet successfully relocated Oytek from its existing Facility to a purpose-built Centre in Istanbul, the whole move took 6 weeks from the date of order receipt and at no stage did Oytek suffer any downtime.

Palmet’s scope was to provide Full Electrical Power Systems including Transformers, Power Distribution Systems, UPS, Generators, Auto Transfer Switching, Security Access, Lighting, Earthing and features included High Security Zones, Penthouse Suites, Restaurants, Call Centres and is one of the largest Technology Data Centres in Turkey.
 

2002 Unimar Power Plant (Marmara Eregli)

Fire Project; Complete replacement of underground Hydrant Systems, including Cryogenic Activity on live main, Replacement Sectioning Valves while System remained live, New Sprinkler System, CO2 Installation.
 

1999 – 2002 Turk Telecom Exchange Buildings

Revenue Share project 28 Nos. Fixed line Exchanges, Full Package Supply from Greenfield Site including Design, Construction, Engineering, Architecture and Electro-Mechanical package.
 

2001 Turk Telecom

Palmet received one of the largest orders ever placed in the Close Controlled Air Conditioning Industry Worldwide. It was for the Supply, Installation and 2 years of Maintenance Services for 2250 Close Controlled Air Conditioning Systems. They were built in Denco’s UK and newly opened Turkish Manufacturing Centres. They were for Turk Telecom’s Fixed Line Regional Exchanges located throughout Turkey.
 

1998 PPG – Bursa (Paint Plant)

Full Fire Scope; Risk Analysis, Designed to NFPA Standards, Fire Pumps, Sprinkler System, Hydrant Line (Ductile Iron), Foam System and Fire Detection System.
 

1995 – 1997 T.C. Vakiflar Bank

Data Processing Centre and Office Building Construction; Suspended Ceilings, Raised Flooring, Partitioning etc., Electrical Works: Lighting, Medium and Low Voltage, UPS, Building Transformer, Diesel Generator, Building Automation, Mechanical Works: FM200, Close Control A/C Units, HVAC etc.)
 

1997 Tengiz Oil – Kazakhstan (Chevron-Bechtel)

Main Control Centre Works; Design and Construction of the Aktrau Centre including the supply of Chillers, Pumps, Air Handling Units, Ductwork, Raised Flooring, Building Automation and Power Network.